Digital Manufacturing Strategic Plan - Part 2 : IST 220, Section 001: Netwk and Telecom, SP21 Manojlovich WC

Digital Manufacturing Strategic Plan - Part

2

Digital Edge Manufacturing Networking Technology

Plan

With the review of user requirements in Part 1 of the Digital Edge Manufacturing Networking

Technology Plan, we are now able to develop an appropriate and adaptable networking framework

that will meet the needs of the company.

Part 1 Review To Be Included In Part 2 Proposal

To tie the general information from Part 1 of the Project to the technical framework in Part 2:

Provide a condensed 2 page review of Digital Edge Manufacturing

Provide a condensed 2-3 page review of the User Domains and their technology needs as

defined in Part 1

Part 2 Technology Framework Requirements

This portion will review the general physical technology implementation requirements for the

proposal.

Wide Area Network – National Offices Interconnection Basic Coverage

Provide a review of what kind of wide area networking components and services will be

needed to ensure communication over large geographic areas such as that of Digital Edge

Manufacturing. This should include a brief review of:

Router placement at each site

Topology of network

Virtual Private Networking or other wide-area technologies needed for secure long distance

communication

Allow for a more substantive NOC at the corporate headquarters to provide general network

overview and backup services for individual building emergency administrative backup

Building Requirements

In general, a secured wireless access is necessary per floor of any Digital Edge Manufacturing

building to support ad-hoc networking and network node movement

There will also be a need for some wired access for items such as projection systems, desktop

machines, printers, etc.

Assume a small switch/hub will be available occasional wired connection needs

In addition to individual room requirements, each building will require:

4/8/2021 Digital Manufacturing Strategic Plan - Part 2 : IST 220, Section 001: Netwk and Telecom, SP21 Manojlovich WC

https://psu.instructure.com/courses/2105341/pages/digital-manufacturing-strategic-plan-part-2 2/5

Wiring closets containing the switches and various wired media hardware

Wireless network authentication server per building

Emergency backup equipment (UPS, redundant servers if needed)

Campus Requirements

Within each campus or multi-building site, the following will need to be included:

Emergency backup equipment (UPS, redundant servers if needed)

A hub / server room which will also be the connect location into national wide area network

Network operations center (NOC) with several administrative consoles and backup

connection capacity

Plant Floor / Laboratory Requirements

With the possibility of machinery (printers, robotics, 3D printers, machine shop components),

wiring capable of withstanding reasonable amounts of electromagnetic interference will be

required

Part 3 General Network Hardware/Software Review

Provide background information for each of the networking technologies you will be implementing

in the final design.

Review of applicable 802.11 wireless standards

Incorporate a brief review of the 802.11 and any other wireless standards you will plan on

employing in the proposal

Include speed, security, authentication standards, and range issues

Review of guided media: twisted pair, fiber, etc.

As there will be some need for traditional media, briefly discuss if you see a need for high

speed wire/optic media and the advantages/issues of each

Review of interconnection hardware – hubs, switches, routers

There will be a need for virtual lans (VLANs), switches and routers in the infrastructure.

Provide a brief overview of the differences between these devices and where you are

planning to incorporate them into the system

Review of security requirements including firewalls, intrusion detection systems,

authentication, encryption standards, and anti-virus solutions

This should comprise a multi-page overview of what security measures each of these

hardware/software security products will provide

Include any discussion of hardware/ software security standards that must be incorporated

to meet financial reporting requirements

Part 4 Technology Framework Design

In this section, combine the user domain needs in Part 1, the physical framework requirements in

Part 2, and your technology selection in Part 3 to create the final Digital Edge Manufacturing

network infrastructure proposal. Besides the content from the previous parts, the following are

guidelines to help with your final proposal.

4/8/2021 Digital Manufacturing Strategic Plan - Part 2 : IST 220, Section 001: Netwk and Telecom, SP21 Manojlovich WC

https://psu.instructure.com/courses/2105341/pages/digital-manufacturing-strategic-plan-part-2 3/5

Diagram - include diagrams for:

General building configuration

Multi-Building / Campus configuration

Server / network management room

Provide hub connection overview for wired and wireless connections

Hardware Vendor Selection –as the project is a general review of networking technology, you do

not need to work within a single vendor or provide extensive description of various networking

hardware/software vendor’s products other than what is necessary to show appropriateness of the

particular item to the particular networking requirement.

Paper Mechanics

Paper format

Serif font

Single space sentences

1” margins

Page numbering

Paper sections and page length

Cover page – not part of page count

Table of Contents – not part of page count

Executive summary – 1 page

Part 1 review – 3-4 pages (1 page demographics and 2-3 of user domains)

Part 2 review – 6-8 pages (work from Part 1 of the project and applies network components

and design)

Part 3 review – 8-10 pages

Part 4 implementation design – 8-10 pages (reference Homework 3 and 4 with a larger

scale geographic or site layout and a couple of representative layouts similar to the building

layout in Homework 3 and 4)

Report summary – 2 pages

References – not part of page count

Diagrams and images

There is no specific limit on the use of diagrams or images within the report. However,

no matter the number of images/diagrams, they will only account for up to 2 pages of

the page count requirement for both general reviews.

Appendices are permitted but are not part of page count

4/8/2021 Digital Manufacturing Strategic Plan - Part 2 : IST 220, Section 001: Netwk and Telecom, SP21 Manojlovich WC

https://psu.instructure.com/courses/2105341/pages/digital-manufacturing-strategic-plan-part-2 4/5

4/8/2021 Digital Manufacturing Strategic Plan - Part 2 : IST 220, Section 001: Netwk and Telecom, SP21 Manojlovich WC

https://psu.instructure.com/courses/2105341/pages/digital-manufacturing-strategic-plan-part-2 5/5


版权所有:编程辅导网 2021 All Rights Reserved 联系方式:QQ:99515681 微信:codinghelp 电子信箱:99515681@qq.com
免责声明:本站部分内容从网络整理而来,只供参考!如有版权问题可联系本站删除。 站长地图

python代写
微信客服:codinghelp